The Building Project |
|
The underwater park was a very challenging construction site. Four metres below the ground water level we battled for years against rising water and quicksand that was soft as pudding.
The very varied geometry of the excavation made it difficult to weld the liner.
Here you can read how the underwater park was created.
|
 The size of the construction reached the limits of the largest concrete pumps. More than 3,000 cubic metres of concrete... |
 ...and over 10,000 tons of rock were used for this underwater dream landscape. |
|
|